2. Hold the carriage jig and move the main unit to
marked position on the floor.
3. Decide the installation position and remove the
carriage jig A and B from main unit base.  
CA UT ION
Hold the Jig A and B to lift the unit by
2 workers to move it. Otherwise, breakage
may result in.
Do not make scratch or damage the floor while moving the
unit. Please use the carriage jig to move it.
4. Fix the main unit with the four screws.
Plywood Floor : Hex head tapping screw M8 x 65
Concrete Floor : A nchor bolts M8 x 70
5. When the moistureproof packing is bigger than
main unit base, please cut it out.
Construction process of anchor bolts.
T emplete
8.5 mm
50mm
or more deep
F loor
1.Drill the anchor holes
of a specific diameter
and depth.
2~ 5mm
2.Clean each anchor hole
thoroughly using a
vacuum cleaner, with a
narrow nozzle attachment
to reach into the hole and
remove all debris.
Hammer
C enter pin
F lat Was her
B as e P late
3.Insert the anchor bolt, tapping
it lightly with a hammer to seat
it. Position the material, and
then drive the center pin into
the anchor unit it is snug.
C AUT ION
If the anchor bolt is tapped with its and contacting the bottom
of the hole, the s trength will be lowered. P roper clearance
mus t exis t between the end of the anchor bolt and the bottom
of the hole.
-8-
Nut
4.A djust the fastening strength
of the nut using a wrench etc.

Advertisement