Docking, Lifting And Trailering; Docking; Lifting - Boston Whaler Montauk 190 Owner's Manual

Hide thumbs Also See for Montauk 190:
Table of Contents

Advertisement

Docking, lifting and trailering

Cleat Locations
Fig. 2.22.1

Docking

Your boat has (3) 8 inch cleats, One at the bow and
two located at the stern, one port and one starboard.
The cleats are used to secure the boat to the dock
while loading/unloading or mooring. Please learn
the proper way to secure the boat and how best to
use the mooring points of your boat.
Figure 2.19.2 shows the correct method for tying a
belaying knot, commonly used to secure a boat to a
dock. This knot will hold fast and is simple to release
when needed.
Belaying Knot
Figure 2.22.2
(Make loop and
rotate before pull-
ing over the horn)
From
Boat
From
Boat
(1)
2-22
Section 2 • General Information
From
Boat
(4)
Pull
(3)
Tight
(2)
Horn
of cleat

Lifting

DANGER
!
Use only the lifting points specified. Using the
cleats for lifting is dangerous and could cause
serious injury or death.
The bow eye is used to haul out and hold your boat
onto a trailer. The stern eyes are used as tie down
points while trailering the boat. The bow and stern
eyes may be used only for short term lifting of the
boat. Long term lifting with bow and stern eyes
can cause stress on the fiberglass and gel coat.
CAUTION
!
Long term lifting with the bow and stern eyes
or lifting with the bow locker eyelet can cause
stress on the fiberglass and gel coat and is not
recommended.
Proper Short Duration lifting
Fig. 2.22.3
1
2
3
1
LIFT CABLE
2
CHAFING PROTECTION
3
BOW EYE
4
STERN EYE (P&S)
5
BOW LOCKER/ANCHOR EYE
(DO NOT LIFT BOAT FROM THIS POINT)
R
1
2
4
5
190 Montauk

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents