Flushing And Filling The Solar Circuit - PAW SolarBloC midi Premium Assembly, Installation And Operation Instructions

Solar stations
Table of Contents

Advertisement

4.1

Flushing and filling the solar circuit

The fill and drain valves necessary to flush and fill the installation are integrated in the solar
station. Make sure not to wash dirt particles that may be present in the solar installation into the
expansion tank. Disconnect the expansion tank from the solar circuit during flushing and filling,
if necessary, and only use flush and fill stations with fine filters.
Ball valve with integrated check valve
(Normal flow direction in the figure: downwards)
Check valve is operating,
flow only in flow direction.
12
45°
Check valve is not operating,
flow in both directions.
997xx3xx-mub-en – V01
4 Commissioning [specialist]
90°
Ball valve closed,
no flow.
2020/08

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solarbloc maxi premiumDn 20Dn 25

Table of Contents