Texas Instruments TMP117EVM Quick Start Manual

Texas Instruments TMP117EVM Quick Start Manual

Advertisement

1

Getting Started With the TMP117EVM

1. Click
here
in Safari, Firefox or Chrome and select the TMP117EVM GUI from the gallery to access the
cloud-based GUI. Upon loading, the browser should appear as shown in
instructions to complete setup of the browser. For windows systems, a standalone version of the
TMP117EVM GUI is available for download here. Unzip and run the setup executable to finish the
installation.
2. Launch the local or cloud based TMP117GUI. The Home screen should appear as shown in
SNOU163 – August 2018
Submit Documentation Feedback
TMP117EVM Quick Start Guide
Figure 1. Cloud-Based GUI Initial Start-Up
Figure 2. Home Screen of TMP117EVM GUI
Copyright © 2018, Texas Instruments Incorporated
Quick Start Guide
SNOU163 – August 2018
Figure
1. Follow the onscreen
Figure
TMP117EVM Quick Start Guide
2.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMP117EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TMP117EVM

  • Page 1 Getting Started With the TMP117EVM 1. Click here in Safari, Firefox or Chrome and select the TMP117EVM GUI from the gallery to access the cloud-based GUI. Upon loading, the browser should appear as shown in Figure 1. Follow the onscreen instructions to complete setup of the browser.
  • Page 2 TI Designs Click here to access the TMP117 product folder for more information. Users can also click on the TMP117EVM GUI Collateral tab to see these documents (see Figure Figure 4. Collateral Tab Containing Additional Learning Materials TMP117EVM Quick Start Guide SNOU163 –...
  • Page 3 IMPORTANT NOTICE FOR TI DESIGN INFORMATION AND RESOURCES Texas Instruments Incorporated (‘TI”) technical, application or other design advice, services or information, including, but not limited to, reference designs and materials relating to evaluation modules, (collectively, “TI Resources”) are intended to assist designers who are developing applications that incorporate TI products;...

Table of Contents