NS3552-16P-2T-2S-V2 Quick Installation Guide
Figure 1: NS3552-16P-2T-2S-V2 Industrial L2+ Multi-port Full
Gigabit Managed Ethernet Switch
Package contents
Thank you for purchasing the NS3552-16P-2T-2S-V2 IFS L2+
industrial managed switch. The descriptions of this model are
as follows:
Industrial 16-Port 10/100/1000T 802.3at PoE +
2-Port 10/100/100T
+ 2-Port 100/1000X SFP Managed Switch
Unless specified, the term "industrial managed switch"
mentioned in this quick installation guide refers to the NS3552-
16P-2T-2S-V2.
Open the box of the industrial managed switch and carefully
unpack it. The box should contain the following items:
The industrial managed switch × 1
Quick installation guide × 1
DIN rail kit × 1
Wall mounting kit × 1
DB9 to RJ45 interface RS232 console cable × 1
Dust cap (see the table below)
RJ45 Dust Cap
NS3552-16P-2T-
2S-V2
P/N 1073645-EN • REV E • ISS 04JUL22
SFP Dust Cap
19
2
If any of these are missing or damaged, contact your dealer
immediately. If possible, retain the carton including the original
packing materials for repacking the product in case there is a
need to return it to us for repair.
Requirements
The industrial managed switch
interface for management purposes. The following equipment
is necessary for further management:
Workstations running Windows
2008 / 10, MAC OS X or later, Linux, UNIX, or other
platforms are compatible with TCP/IP protocols.
Workstations are installed with Ethernet NIC (Network
Interface Card)
Serial port connection (Terminal)
The above workstations come with a COM Port (DB9)
or USB-to-RS232 converter.
The above workstations have been installed with a
terminal emulator, such as Tera Term, PuTTY, or
Hyper Terminal included in Windows.
Serial cable – One end is attached to the RS232
serial port, and the other end is attached to the
console port of the managed switch.
Ethernet port connection
Network cables – Use standard network (UTP) cables
with RJ45 connectors.
The above workstations have a web browser and
JAVA runtime environment plug-in installed.
Note: We recommend using Internet Explorer 11.0 or later to
access the industrial managed switch. If the web interface of
the industrial managed switch is not accessible, turn off the
anti-virus software or firewall and then try it again.
Wiring the power inputs
The upper panel of the industrial managed switch indicates a
DC inlet power socket and consists of one terminal block
connector within six contacts. Follow the steps below to insert
the power wire:
1.
Insert the positive/negative DC power wires into contacts 1
and 2 for Power 1, or 5, and 6 for Power 2.
NS3552-16P-2T-2S-V2 : DC 48~56V
provides a
remote login
®
XP / 2003 / Vista / 7 / 8 /
1 / 6