Assembly; Downpipe And Rainwater Barrel - FLORABEST FRWS 9 A1 Assembly Instructions Manual

Downpipe rainwater diversion set
Hide thumbs Also See for FRWS 9 A1:
Table of Contents

Advertisement

Available languages

Available languages

Figure C (Working materials needed):
Protective gloves
Protective goggles
Pencil
Spirit level
Drill
Detergent
Carpet knife/fi le

Assembly

Downpipe and rainwater barrel

IMPORTANT
The borehole in the downpipe is also the maximum fi lling height of the
rainwater barrel.
Be aware of unevenness in the terrain, so as to prevent subsequent over-
fl ows from the rainwater barrel. It is best to place the rainwater barrel at its
fi nal intended location and to then transfer the marking for the max. fi lling
level onto the downpipe with a spirit level.
1. Using a spirit level and a pencil, mark the hole positions onto the rainwater
barrel and downpipe (see Figure D).
WARNING - RISK OF INJURY
When drilling, be sure to wear personal protective equipment (goggles
and gloves).
Exercise caution when handling the crown drill.
Exercise caution when deburring with the carpet knife. The blade is very sharp!
2. Drill the hole in the down pipe with the crown drill
care to drill with light pressure only, especially in sheet metal downpipes.
Then deburr the drillhole with a suitable tool, such as a carpet knife for
plastic downpipes or a fi le with sheetmetal downpipes.
3. Now drill the hole in the rainwater barrel with the crown drill and then
deburr the drillhole (see Figure F).
FRWS 9 A1
(see Figure E). Take
GB
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

73211

Table of Contents