Installing The Upm Card; Required Tools - HP StorageWorks director 2/64 Installation Instructions Manual

Universal port module kit
Table of Contents

Advertisement

Figure 5: Director 2/140 UPM filler blank removal
4. Pull the filler blank out and remove it from the director chassis.

Installing the UPM Card

Use the following procedures to install a UPM card. A list of required tools is
provided.

Required Tools

The following tools are required to perform these procedures.
ESD grounding cable and wrist strap.
Torque tool and hex adapter (provided with the director).
Fiber optic protective plugs (provided with the director).
universal port module kit installation instructions
Installation Instructions
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/140

Table of Contents