HP StorageWorks director 2/64 Installation Instructions Manual page 22

Universal port module kit
Table of Contents

Advertisement

Installation Instructions
12. Verify loopback plug(s) are installed and click Next. The following message
displays:
Verify selected ports are beaconing.
13. Verify beaconing is enabled, then click Next. The following message displays:
Press START TEST to begin diagnostics.
The Next button changes to Start Test.
14. Click Start Test. The test begins and:
— The Start Test button changes to Stop Test.
— The message Port xx: TEST RUNNING displays, where xx is the port
number. If a UPM card is tested, the message displays for all four ports.
— A red progress bar (indicating percent completion) travels from left to right
across the Completion Status field.
As an individual port is tested, the amber LED flashes (beacons) and the green
LED illuminates (indicating loopback traffic through the port).
NOTE: Click Stop Test at any time to abort the loopback test.
15. When the test completes, test results display (for each port tested) as Port xx:
Passed! or Port xx: Failed! in the message area of the dialog box. If a
port fails the test, the amber LED for the port remains illuminated.
16. When finished, click Cancel to close the Port Diagnostics dialog box and return
to the Hardware View. Beaconing is disabled for the port or UPM card.
17. Reset each tested port:
a. At the Hardware View, double-click the UPM card for which ports were
tested. The Port Card View displays.
b. At the Port Card View, right-click the tested port. A menu displays.
c. Choose Reset Port. A Reset Port n message box displays, where n is the
port number.
d. Click OK. The port resets.
18. Remove loopback plug(s) from the tested ports.
19. Reconnect fiber optic jumper cables from devices to tested ports.
14
universal port module kit installation instructions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/140

Table of Contents