HP StorageWorks director 2/64 Installation Instructions Manual page 11

Universal port module kit
Table of Contents

Advertisement

Installation Instructions
NOTE:
Figure 1
shows a cable management assembly for the Director 2/64 that is only used
with the 9000, 10000, and 11000 Series cabinets.
NOTE: For the Director 2/64, rotate the cable management assembly, if used, to reach the
grounding point. The assembly locks into the raised position. Any cables attached to the Director
2/64 are then held up, allowing access to the lower front of the chassis. If no cables are attached
to the director, the assembly may be removed.
.
1
Director 2/64 ESD Grounding Point
Figure 1: Director 2/64 ESD grounding point (front)
universal port module kit installation instructions
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks director 2/140

Table of Contents