Download Print this page

Bison SVH-1 Operator's Manual page 10

Subsoiler

Advertisement

LISTS OF INSPECTION
POST-SALES INSPECTION
It's advised that the following items are constantly checked during first hours of operation.
■ Fully check the machinery and certify there are no damaged parts.
Repair or change if necessary. AII guards shall be in place.
■ Check there are no loose or missing screws. lf possible, operate Subsoiler to check proper
operation.
■ Check during Subsoiler operation that there is no interference between hoses and mobile
parts that can be damaged.
■ Check the operator's manual in full with your client and highlight importance of a regular and
proper lubrication as well as safety precautions.
Inspection Date____________ Name and Signature___________________________
MORNING OPERATION INSPECTION
Lube all points in need of daily lubrication and those that require lubrication at a recommended
time.
■ Ensure all screws are complete and parts tight.
■ Check that mounting components are safe.
SEASONAL INSPECTION
■ Check general state of Subsoiler (normal wear and tear, no bumps, no leaks in ducts, etc.)
■ Ensure that proper lubrication has been made.
■ Ensure that the proper operating adjustments are made.
05

Advertisement

loading

This manual is also suitable for:

Svh-5/3Svh-9/5