4. Installing the X-ray Unit: Base Stand Type
4.7
Leveling the X-ray Unit
To level the equipment using a spirit level:
Required Tool
1.
Prepare a spirit level.
Turn the rotating unit clockwise so that the X-ray tube head faces the front.
2.
3.
Loosen eight screws with a T-shaped hex wrench.
62
T-shaped Hex
Wrench
Spirit Level
Green X / X18 (Model: PHT-75CHS) Installation Manual
8 mm / 0.3"
N/A