Girard Systems GC136 Installation And Instructions Manual

Girard Systems GC136 Installation And Instructions Manual

Ac motor control module

Advertisement

AC MOTOR CONTROL MODULE
GC136
INSTALLATION and PAIRING INSTRUCTIONS
REV.12302015
RV AWNING PRODUCTS
1361 CALLE AVANZADO, SAN CLEMENTE, CA 92673(800) 382-8442 FAX (949)276-5500
www.girardrv.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GC136 and is the answer not in the manual?

Questions and answers

Summary of Contents for Girard Systems GC136

  • Page 1 AC MOTOR CONTROL MODULE GC136 INSTALLATION and PAIRING INSTRUCTIONS REV.12302015 RV AWNING PRODUCTS 1361 CALLE AVANZADO, SAN CLEMENTE, CA 92673(800) 382-8442 FAX (949)276-5500 www.girardrv.com...
  • Page 2 Shore Power – if connected; Generator Power – if the generator is running; Inverter Power – batteries must be charged for inverter operation. Girard Systems awnings are supplied with an electric motor appropriate to the product. Page 2 of 10...
  • Page 3: Product Description

    PRODUCT DESCRIPTION The G – Link GC136 is a single awning motor control unit that can be remotely operated with a G-link paired handset listed in this manual from a distance of up to 500ft. in open air and up to 100ft in the presence of obstructions. The operating frequency is 433.92MHZ.
  • Page 4 The GC136 may also be operated by use of the IN/STOP/OUT buttons on the side of the unit (Fig. 1). The direction of travel of the motor can be reversed by using the Reverse switch as indicated in (Fig. 2).
  • Page 5 1. Install a UL approved 110VAC junction box in which to make the electrical connections. 2. Route the Awning’s Motor cable to this location and make the connections to the GC136 in accordance with NEC requirements.
  • Page 6: Setup And Programming

    1. Selection of “Continuous” or “Step” mode. a. Supply power to the GC136. b. Simultaneously press the STOP and RIGHT button of the GC136 for at least 6 seconds: The Green LED will first illuminate and then blink a few times. When...
  • Page 7: Programming To A Motion Sensor

    PROGRAMMING TO A MOTION SENSOR First the Motion sensor will need to be prepared for programming by carrying out the following procedure. Remove the 2 small Phillips screws which secure the motion sensor to the mounting bracket. The base of the module is magnetized so will need to be gently lifted...
  • Page 8 Remove the 4 Phillips screws holding the Base Plate Magnet module together. Remove the base plate and silicone insert. Insert Fig.3 Turn the base plate over (Magnet down). Then place the Reed Switch motion sensor on top of it so that the magnet is aligned with the reed switch.
  • Page 9 Using a small screwdriver or the end of a paper clip press the Program Button on the GC136 Motor Controller. (see fig 9) The Green LED on the Motor Controller will begin to flash.
  • Page 10: Programming To An Anemometer

    4) Press the up button on the Anemometer to retract the awning or physically activate it by spinning the cups. For queries or assistance with programming any of your G-Link devices please call Girard Systems TOLL FREE on 800–382–8442 between 7:30am and 3:30pm P.S.T. Page 10 of 10...

Table of Contents