Panasonic AG-DV2500P Service Manual page 52

Hide thumbs Also See for AG-DV2500P:
Table of Contents

Advertisement

2.5
PERIODICAL MAINTENANCE
Perform maintenance at the correct times in accordance with the maintenance table.
Fig. 2-5-1 shows the flow chart of periodical maintenance procedures at different operating hours.
Every 2000-hour maintenance
Replaced parts
°
SUP. Pole Base assembly
·
TU Pole Base assembly
Î
Guide roller
Î
Coller
Î
Frange
3 Pinch roller arm assembly
2 Drum assembly
& SUP R. disk assembly
* TU R. disk assembly
^ CONN. gear assembly
@ SUP tension band assembly
$ TU tension band assembly
! Idle arm assembly
1 Head cleaner
2.6.8 SUP. TEN. BAND adjustment
2.6.9 TU. TEN. BAND adjustment
2.8 Toeque adjustment
2.9 Interchangeability adjustment
3.2.1 PB switching point
adjustment
3.2.3 ME SP VCO OFFSET
adjustment
Start
End
6000-hour maintenance
Start
Replaced parts
Mechanism assembly
(including Drum assembly and
Cassette housing assembly)
2.8 Toeque adjustment
2.9 Interchangeability adjustment
3.2.1 PB switching point
adjustment
3.2.3 ME SP VCO OFFSET
adjustment
End
Fig. 2.5.1
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ag-dv2500e

Table of Contents