2500 megamix thermostatic mixing valve with thermal flush lift lever (28 pages)
Summary of Contents for Watts HKF20 Series
Page 1
Series HKF20 Pump mixing valve group with thermostatic fix point control for heating systems Installation and Operating Manual (translated from the original operating manual) WattsWater.eu...
ENGLISH Contents 1 General information 1 General information ........2 1.1 Important information 1.1 Important information .............2 The operator is responsible for ensuring adherence to the local laws and regulations 1.2 Product conformity ............2 (e.g. accident prevention regulations, etc.). 1.3 Product features .............2 Incorrect operation or operating the pump 2 Safety ............
ENGLISH The pump group is not intended to be operated by people 2 Safety (including children) with physical, sensory or mental disabilities, nor by people with insufficient experience or 2.1 Presentation of the safety instructions previous knowledge. DANGER indicates an imminent danger 2.4 Foreseeable misuse that may cause serious physical injury or The following is considered to be foreseeable misuse:...
ENGLISH 3 Technical data Hydraulic performance data Max. operating pressure 6 bar Ambient temperature -2 °C to +40 °C ( observe pump specification! Operating temperature +2 °C to +90 °C ( observe pump specification! Opening pressure of gravity brake 10 mbar Kvs mixing valve Temperature display area 0 - 120 °C...
ENGLISH 6 Construction 7 Installation and commissioning Electricity! Risk of death from electric shock. • Work on parts carrying live voltage must only be carried out by trained electricians. • Disconnect the power supply of the system and secure it against being switched back on before carrying out any installation, mainte- nance, cleaning or repair work.
ENGLISH 7.1 Installation diagram 7.3 Initial Commissioning Requirement • The pump group is completely assembled. Connection of the power supply 1. Connect the power supply (see separate pump documentation). 9 The pump group switches on automatically after being connected to the power supply. 2.
ENGLISH 6. Tighten the loosened connections to the pump and ball 7.5 Exchanging the supply and return line valve (observe tightening torques!). Slide the pump group Initial situation: the supply is on the right side. onto the wall bracket and fasten the retaining clips and ball 1.
ENGLISH 8 Maintenance 8.1 Annual maintenance intervals 1. General visual inspections Electricity! • Check the station for leaks and retighten sealing connec- tions or replace seals, as required. Only perform maintenance work on the pump group if the voltage supply has been 2.
ENGLISH 8.3 Disassembling the circulation pump 1. Disconnect the power supply and secure it against being switched on again. 2. Remove the front panel of the pump group (A, fig. 1). 3. Close all stop valves by turning the thermometer handle (B, fig.
ENGLISH 8.5 Disassembling of the thermostatic mixing valve 1. Disconnect the power supply and secure it against being switched on again. 2. Remove the front panel of the pump group (A, fig. 1). 3. Close all stop valves by turning the thermometer handle (B, fig.
Warranty: All sales and contracts for sale are expressly conditioned on the buyer’s assent to Watts terms and conditions found on its website at www.wattswater.eu/gtc/ Watts hereby objects to any term, different from or additional to Watts terms, contained in any buyer communication in any form, unless agreed to in a writing signed by an officer of Watts..
Need help?
Do you have a question about the HKF20 Series and is the answer not in the manual?
Questions and answers