Commissioning; Switching On The Device / Operation - E.E.P.D. Getting Started Guide Device Reference Manual

Table of Contents

Advertisement

Commissioning

If connections are no longer accessible after system installation,
connect all cables before final mounting.
Only connect the power cable when the power supply is
switched off.
Before commissioning, we recommend connecting or inserting:
Monitor
USB keyboard and mouse
Network cable (optional)
DC power supply
Other plug & play devices can be connected after commissioning.
E.E.P.D. GmbH | Gewerbering 3 | 85258 Weichs
Copyright © 2021 by E.E.P.D. GmbH. All rights reserved. | Rev.1.2
EM PRO midi E
Device Reference Manual – P – Revision 1

Switching on the device / Operation

After all preparations have been made, the system is ready to be connected
to the power supply.
Press the power button to switch on the system. When the system is powered,
the Power LED on the power button will be on.
If an operating system is installed, it will start now. An operating system
installation can be performed with all common installation media such as USB
stick, USB DVD drive or remote network start. The BIOS boot order has to be
adjusted accordingly. To enter the BIOS setup, press the "ESC" key
immediately after switching on.
Please refer to the operating system manual for switching off / shutting down.
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Em pro midi e

Table of Contents