Download Print this page

YewdaleDefiant VL31 Split Draw Manufacturing Instructions

Vertical blinds

Advertisement

Quick Links

Manufacturing Instructions
for YewdaleDefiant
vertical blinds
®
(VL31 Split Draw)
yewdale.co.uk
Part no: 1002

Advertisement

loading
Need help?

Need help?

Do you have a question about the VL31 Split Draw and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for YewdaleDefiant VL31 Split Draw

  • Page 1 Manufacturing Instructions for YewdaleDefiant vertical blinds ® (VL31 Split Draw) yewdale.co.uk Part no: 1002...
  • Page 2: Safety Instructions

    Manufacturing Instructions YewdaleDefiant vertical blinds (VL31 Split Draw) ® Safety Instructions: Loops in pull cords, chains, tapes and inner cords that operate the product can cause strangulation To avoid strangulation and entanglement, keep cords out of the reach of young children. Cords may become wrapped around a child’s neck Move beds, cots and furniture away from window covering cords Do not tie cords together.
  • Page 3 VL31 Split Draw Control: Call: +44 (0)1268 570900 Fax: +44 (0)1268 732509 Email: enquiries@yewdale.co.uk Visit: www.yewdale.co.uk...
  • Page 4 Manufacturing Instructions YewdaleDefiant vertical blinds (VL31 Split Draw) ® VL31 Split Draw Control: Please note, eye, hand and ear protection must be worn when carrying out the tasks below. Check the profile - part number 92700W, and spline - Part number 927006, are free from damages.
  • Page 5 Using the formula below calculate the correct amount of trucks. Actual blind width ÷ actual link length For example, for a 400mm blind: 89mm louvre (the actual link length is 79mm) 400÷79mm = 5pcs 127mm louvre (the actual link length is 115mm) 400÷115mm = 4pcs Round the figure up to next whole/even number.
  • Page 6 Manufacturing Instructions YewdaleDefiant vertical blinds (VL31 Split Draw) ® Loading the first stack of trucks onto the spline, with the links facing away from the stack position, insert a stop ring – 927010, onto the spline between the first and second truck.
  • Page 7 Now insert the spline and trucks into the profiled channel – 92700W. Slide the lead trucks down the channel. Using the workings below, insert the appropriate tubular spacer part number 927007W onto the spline on the outside edge of the second stack of trucks.
  • Page 8 Yewdale, Enterprise Way, Wickford, Essex SS11 8DH Call +44 (0)1268 570900 +44 (0)1268 732509 Email enquires@yewdale.co.uk Visit yewdale.co.uk For more information on all Yewdale products, please call the sales department. ® ® ® ® ® A comprehensive range The only fail-safe range of The industry’s preferred A dedicated range of privacy A concise approach to...