Operation - ALDI GARDENLINE 61621 User Manual

Hand push mower 38cm
Table of Contents

Advertisement

Hand Push Mower 38cm
Assembly of the grass catcher (Fig. 4)
• Snap the fastening lugs of the grass catcher (12) over the grass catcher frame (13).
Attaching the grass catcher (Fig. 1)
• Attach the assembled grass catcher (12) onto the mower attachment (9) by hooking
in at the back side.
• Secure the grass catcher (12) with the strap (14) at the handle of the lawn mower.
VI. OPERATION
Adjust the cutting height (Fig. 1)
The cutting height is adjustable from 15 – 44 mm:
• Loosen the star grip screws (10) on both sides of the machine.
• Place one foot on the castor (17) and set the desired cutting height with both hands
on the handles for height adjustment (8). Ensure that the machine is set to the same
height on both sides.
• Retighten the star grip screws (10).
Working Instructions
m Before each use, check the machine for obvious defects, such as loose, worn
or damaged parts. Check that all nuts, bolts and screws are sitting firmly.
Regular mowing stimulates the stronger formation of leaves in the grass as well as al-
lowing weeds to die off at the same time. Thus, the lawn becomes thicker each time it
is mowed and a lawn with even resilience is produced.
• Push the machine at walking pace, in strips that are as straight as possible. For
seamless mowing, the strips should always overlap by a few centimetres.
• On slopes, always work across the slope.
• Choose a higher cutting-height for the first cut of season and reduce the height
around 20 mm for the subsequent cuts.
• Clean the equipment after each use and store at a dry and frost free place.
Note!
Empty the grass catcher (12) after each use.
• Loosen the strap (14) at the handle of the lawn mower.
• Dismount the grass catcher (12) from the mower attachment (9) by hooking out at
the backside.
• Re-attach in reverse order.
Let it dry in a well-ventilated area.
AFTER SALES SUPPORT
1300 855 831
MODEL: HAND PUSH MOWER 38CM PRODUCT CODE: 61621
Assembly/Operation
 support@scheppach.com.au
AUS
11
10/2018

Advertisement

Table of Contents
loading

Table of Contents