Manual RHGSE Operation and Maintenance Manual
4.0) Setup the Equipment
Remove the lubridryer, load indicator , load indicator holder, upper upright bracket, and 600 lbs. hook checkpoint
from the Rotatub and unpack.
Lubridryer
Attach the Upper Upright Bracket to the inside of the Upright Bracket with the supplied (1) ¼-20 x ¾" long screw
and locknut.
This manual contains proprietary information and is not to be copied or disclosed without written permission from Zephyr International LLC
Load indicator
Upright bracket
Upper Upright Bracket may remain in place permanently.
Figure 7 Upper Upright Bracket assembly
Attach Lubridryer and
Load Indicator holder
using the supplied
hardware.
Figure 8 Lubridryer Assembly
Copyright 2002-2015
Upper Upright
bracket
Figure 6 Setting Up
Note
ZGS-10245-1 Upper
Upright Bracket
Upright Bracket
Attach to this
hole location
ZOM-11000-2 v2 Rev G
600 lbs. Hook
Checkpoint
.
Page 7 of 38
Need help?
Do you have a question about the ZGS-11000-2 v2 and is the answer not in the manual?
Questions and answers