Download Print this page

Ranger design C5-BA13-5 Installation Manual page 13

Bottle holder

Advertisement

with ranger floor
2.4.2 • Lift the bottle holder unit inside the van, then put it in place.
• Install the bottle holder unit to the floor mounting track by sliding bolts in the mounting tracks,
and putting screw in the last rear slot of the end panels of the shelving unit.
For technical support, contact us at 1-800-565-5321
TOOLS
q Cordless Impact
q 3/8" Driver Bit
q 1/2" Socket
HARDWARE USED
floor fastener kit
#92-102 Screw 1"
HARDWARE USED
floor fastener kit
#90-490 Carriage Bolt 5/16" × 1"
#98-116 Lock Washer
#98-122 Flat Washer
#94-104 Hex Nut
C5-BA13-5 Installation Guide | REV. A1 | Page 13

Advertisement

loading