Operation Sequence Of The Burner (Light Oil Operation) - Riello RLS 120/E FGR Installation, Use And Maintenance Instructions

Dual fuel light oil/gas burner
Table of Contents

Advertisement

4.14

Operation sequence of the burner (LIGHT OIL operation)

CPI/POC
X07
X06
X10
X08
X20+X21
X32+X33
X34
X4
X01
X02
X03
X25
X26
X05
S9782
CPI= Closed Position Indicator
POC= Proof Of Closure
(3)
Oil irrelevance time P323, has an effect on the oil safety chain and on the minimum oil pressure when the air valve is opened.
Key to layout (Fig. 8)
Any position
t1
Safety circuits enabling standby time
(boiler and fuel)
t2
Gas valve opening time (with valve leak
detection control device active)
t3
Servomotor opening time
t4
FGR servomotor activation time
t5
Pre-purging time
t6
Pre-ignition time
t7
Flame ignition safety time
t8
Flame stabilisation time
t9'
2nd stage safety time
t10
Modulation phase
t11
Adjustment time
t12
Gas valve opening time (with valve leak
detection control device active)
t13
Post-purging time
t15
post-combustion time
t16
Flame switching off control time
t17
Gas valve control time (with valve leak
detection control device active)
Technical description of the burner
2.4 s
30/60 s
0 - t5
adjustable
adjustable
3s
adjustable
3s
3s
adjustable
adjustable
5 s
30s
Tab. H
15
GB
Key to layout (Fig. 8)
X01
Oil valve 1st level
X02
Oil valve 2nd level
X03
Oil valve 3rd level
X04
Ignition transformer
X05
Oil pressure > min.
X06
Oil safety circuit
X07
Boiler safety circuit
X08
Air pressure switch
X10
Burner on
X20+X21 Flame signal
X25
Fan on
X26
Oil pump
X32
Air servomotor
X33
Fuel servomotor
X34
FGR servomotor (disabled)
Fig. 8
20168262

Advertisement

Table of Contents
loading

This manual is also suitable for:

20166921

Table of Contents