Hydraulic System; Pump; Pump Priming; Burner Calibration (Light Oil Operation) - Riello RLS 70 Installation, Use And Maintenance Instructions

Table of Contents

Advertisement

(A)
PUMP - SUNTEC AJ6 CC
(B)
Burner OFF
Burner ON
(C)
A
kg/h
B
bar
C
bar
D
cSt
E
°C
F
bar
G
bar
H
mm
1
2
1st stage
2nd stage

HYDRAULIC SYSTEM

Key (A)
1 Pump suction
2 Filter

3 Pump

4 Pressure governor
5 Return pipe
6 By-pass screw
7 Pump return
8 Safety solenoid
9 1st stage valve
10 2nd stage valve
11 Filter
M Pressure gauge
V Vacuometer
PUMP (B)
1 - Suction
2 - Return
3 - Pressure gauge attachment
4 - Vacuum meter attachment
5 - Pressure governor
A - Min. delivery rate at 12 bar pressure
B - Delivery pressure range
C - Max. suction depression
D - Viscosity range
E - Max light oil temperature
F - Max. suction and return pressure
G - Pressure calibration in the factory
H - Filter mesh width

PUMP PRIMING

-
D1184
-
-
-
-
The time required for this operation depends
upon the diameter and length of the suction tub-
ing. If the pump fails to prime at the first starting
AJ6 CC
of the burner and the burner locks out, reset the
220
burner, and then repeat the starting operation.
10 - 20
Do not illuminate the cell UV or the burner will
lock out.
0,45
2.8 - 75
BURNER CALIBRATION (light-oil operation)
60
2
N.B.
12
It is advisable to first set the burner for operating
0.15
on oil and then for gas.
D1177
WARNING
Execute the fuel exchange when the burner
is off.
FIRING
Set switch 1)(C) to "ON".
During the first firing, during the passage from
the 1st to the 2nd stage, there is a momentary
lowering of the fuel pressure caused by the fill-
ing of the 2nd stage nozzle tubing.
This lowering of the fuel pressure can cause the
burner to lock-out and can sometimes give rise
D469
to pulsations.
12
Before starting the burner, make sure that
the tank return line is not clogged.
Obstructions in the line could cause the
sealing organ located on the pump shaft
to break. (The pump leaves the factory with
the by-pass closed).
Also check to make sure that the valves
located on the suction line are open and that
there is sufficient fuel in the tank.
For self-priming to take place, one of the
screws 3)(B) must be loosened in order to
bleed off the air contained in the suction line.
Start the burner by closing the control
devices, with switch 1)(A) in the "ON" posi-
tion and with switch 30)(A)p.4 in the "OIL"
position.
The pump can be considered to be primed
when the light oil starts coming out of the
screw 3)(B).
Stop the burner: switch 1)(C) set to "OFF"
and tighten the screw 3)(B).
G 1/4"
G 1/4"
G 1/8"
G 1/8"

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Rls 100Rls 130200792082007921520079217

Table of Contents