Siemens SITRANS SITRANS WF100 Operating Instructions Manual page 21

Hide thumbs Also See for SITRANS SITRANS WF100:
Table of Contents

Advertisement

Installation
1. Set the flowmeter housing in place ensuring that the flowguide and outlet gaskets are
correctly located (gaskets supplied by customer).
2. The housing must be vertical within 1° in two planes 90° apart.
3. Bolt the flowguide and outlet flanges to the process piping.
4. Remove the shipping stop
Note
The hole in the enclosure for the shipping stop should be plugged with a bolt or cap to
ensure a dust-tight seal.
5. Connect the unit to the integrator
SITRANS WF100
Operating Instructions, 08/2021, A5E51108132-AA
Infeed (customer supplied)
Mounting hardware
Gasket
SITRANS WF100
Discharge (customer supplied)
Calibration pulley
Installing/Mounting
21

Advertisement

Table of Contents
loading

Table of Contents