Top Installation - Heartland 3400 User Manual

Legacy 30/36/42” hood 500/900 cfm metro 30/36/42” hood 500/900 cfm
Hide thumbs Also See for 3400:
Table of Contents

Advertisement

C. Top Installation
1.
Locate and mark the centerline of the
hood.
2.
Use wood panel of 1/2" thick by 12"
high (see the sketch to determine width
of panel).
3.
Screw two 2" X 4" (thin side down)
perpendicular and at the bottom of the
wood panel. See sketch for location.
4.
Screw a second set of 2" X 4's angled
to reach the front end of both previous
2" X 4"s and each top side of the wood
panel.
5.
Screw another 2" X 4" inside the ends
of first set of 2" X 4"s (wide side
down).
O p tio na l w oo d fram e s up po rt u se d
w he n th e u nit in clud e s tw o b lo w e rs
W o od p an e l o f 1 /2 " th ick
Top o f th e h oo d
3 /4 "
C L
4
3
6
5
3 /4 "
Residential Wall Mount Hood
6.
Add one 2" X 4" (thin side down) in the
middle when using a to blower unit. Add
two 2" X 4's (thin side down) in the
middle when using a three blower unit.
With one blower unit, no middle stud is
necessary
7.
Drill 7/8" diameter hole through the 1/2"
tick wood panel and drywall 2" above
the top of the hood for the conduit wire.
8. Run 120 VAC, 15A (minimum) circuit
electrical power cable from the service
panel through the 7/8" hole of drywall.
MAKE SURE THE POWER IS OFF.
1
Drill 7/8" hole in the drywall
for the power supply.
2
4
3
1 2"
11"
1 2"
7
1 5-1/2"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

34103415340534203425

Table of Contents