Bringing Up And Verifying Fccs - Cisco Router IOS XR Getting Started Manual

Cisco systems router getting started guide
Hide thumbs Also See for Router Cisco IOS XR:
Table of Contents

Advertisement

Bringing Up and Verifying FCCs

oim count 1
oim instance 0 location F1/SM9/FM
!
controllers fabric plane 4
oim count 1
oim instance 0 location F2/SM0/FM
!
controllers fabric plane 5
oim count 1
oim instance 0 location F2/SM9/FM
!
controllers fabric plane 6
oim count 1
oim instance 0 location F3/SM0/FM
!
controllers fabric plane 7
oim count 1
oim instance 0 location F3/SM9/FM
!
end
Bringing Up and Verifying FCCs
When Rack 0 is up and configured to support the rack number and FCC fabric plane plans, it is time to
bring up and configure the FCC in the multishelf system as described in the following procedure.
SUMMARY STEPS
1.
2.
3.
4.
5.
Cisco IOS XR Getting Started Guide
3-34
Apply power to all FCCs.
show controllers fabric rack all detail
show controllers fabric plane all detail
show controllers fabric connectivity all detail
On the external Catalyst switches, verify that the links are not unidirectional.
Chapter 3
Bringing Up the Cisco IOS XR Software on a Multishelf System
OL-10957-02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ios xr 3.4

Table of Contents