Wall-Mount Installation; Optional Floor Stand Mount Installation - Pentair EVERPURE EZ-RO 375/16ATM-BL Installation & Operation Manual

Reverse osmosis systems with blending & atmospheric tanks
Table of Contents

Advertisement

WALL-MOUNT INSTALLATION

Locate system near electrical outlet, equipment, drain,
and water source.
• Do not block access to controls and filters.
• Leave at least 3" clearance below the cartridges
for removal.
• Mount processor where it is well-supported.
• Using appropriate wall anchors or screws, fasten
anchors into concrete or screw directly into studs
beneath wall board. If using concrete fasteners,
follow manufacturer's instructions.
NOTE: If mounting on drywall, locate studs. Make sure that
at least two of the anchors will be fastened into a stud.
1. Remove RO processor top cover by loosening
Phillips screw in the back. Using a level, draw a line
where the top or bottom of the bracket will be. Hold
the RO processor on the line in the position it will be
mounted and mark the four holes on the bracket.
2. Secure RO processor to wall using appropriate wall
anchors. Put in screws with enough clearance to
install the bracket.
3. How to use the supplied drywall/stud anchors:
a. Using #2 Phillips screwdriver, press drywall/stud
anchor tip slightly into drywall. Applying pressure,
turn anchor. If wood stud is hit, increase pressure.
Continue turning anchor until flush.
b. Insert screw into anchor and mostly screw it in.

OPTIONAL FLOOR STAND MOUNT INSTALLATION

Locate system in a secure location that' s near electrical
outlet, equipment, drain, and water source.
The floor stand kit part number is: EV315968.
• Do not block access to controls and filters.
1. Remove RO processor top cover by loosening
Phillips screw in the back. Note the screw slots and
tabs on the floor stand.
• On 375 models (size 4 cans: 14.5" long) use the
lower tabs and screw slots.
• On 650 models (size 7 cans: 20.75" long) use the
upper tabs and screw slots.
2. Hook the appropriate two slots on the back of the
processor over two tabs on the floor stand.
3. From the back of the stand, screw the stand and
processor together.
• You can leave cover off until final flushing.
8 | PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE
1
3
4. Hook processor over all
four screws.
5. Slide processor to one
side and tighten screws.
• You can leave cover
off until final flushing.
1
3
12"
13"
2
4
5
2
FOODSERVICE.PENTAIR.COM

Advertisement

Table of Contents
loading

Table of Contents