Preparing For Installation; Powering Down The Router - Cisco CISCO10720 Installation And Configuration Manual

Internet router uplink cards installation and configuration
Table of Contents

Advertisement

Preparing for Installation

Preparing for Installation

Please read the following instructions when preparing to remove an uplink card from the
Cisco 10720 Internet Router:
Go to the
procedure.

Powering Down the Router

Follow the steps in this section to power down the router and disconnect the site power.
If the cable-management cover is installed on the router, it must be removed in order to access the power
Step 1
switch. (See the
remove the cable-management tray until all cables are removed from the cards and power supply.
Figure 3-1
1
1
2
Use an ESD-preventive strap when disconnecting power leads on the router. See the
Caution
Electrostatic Discharge" section on page
Book Title
3-2
Powering Down the Router, page 3-2
Verifying That the Router Is Powered Down, page 3-4
Removing the Cable-Management System, page 3-4
Removing the Cable-Management System, page 3-4
"Powering Down the Router" section on page 3-2
" •Removing the Cable-Management System, page 3-4" section on page
AC and DC Power Supplies in the Off Position
IN O K
D C
O T F
IN O K
D C
O T F
2
3
Power on symbol (–)
Power off symbol (O)
Chapter 3
to continue the uplink card removal
IN O K
D C
O T F
IN O K
D C
O T F
3
AC power switch
4
DC power switch
2-4.
Installing and Removing the Uplink Cards
3-2.) Do not
4
"Preventing
78-13113-06 B0

Advertisement

Table of Contents
loading

This manual is also suitable for:

10720

Table of Contents