Pressure Control Transducer Installation
1
Install o-ring and
transducer in filter base.
Torque to 35-45 ft-lb (47-61
N·m). Install grommet onto
transducer and transducer
into control box.
Pressure Control Transducer Installation
1
Pressure Control Transducer Installation
1
311287A
2
Install control box (61) and
control panel (68) with four
screws (39).
2
2
3
Connect transducer
connector to motor control
board.
3
3
Repair
4
Install cover (96) with four
screws (38).
4
4
47