Triton 2181629F Manual page 11

Table of Contents

Advertisement

Complete the pipework to the bracket mounting
points. Leave an excess of pipe protruding out
of the wall of approximately 60mm as measured
from the face of the finished wall or tiles (fig.9).
Flush the pipework through to remove any
debris.
Check for leaks and remedy as necessary.
Make good the wall, tiled surfaces MUST be
level, check with spirit level.
Ensure the pipes exiting the wall are free and
can move in and out of the wall by a maximum
distance of 4mm (fig.10).
Push each pipe into the wall until it stops against
the depth of chasing. Measure 21mm to 25mm
from the face of the finished wall or tiles and
mark the pipe.
Using a pipe cutter, cut the pipe and deburr.
IMPORTANT: When the pipework is at rest
against the depth of chasing the length of pipe
protruding from the wall should be between
25mm MAXIMUM and 21mm MINIMUM from
the face of the finished wall or tiles (fig.11).
Make sure the outer surface of the pipes is clean
and free of any debris or damage. Clean the
surface if necessary.
Mark the positions of the wall bracket holes and
drill the wall/tiles to suit.
Slide the wall bracket over the pipework and
securely fix to the wall.
Slide the olive over the pipework and push down
until it meets the wall bracket. Ensure the olive
is clear of the end of the pipework and the pipe
does not enter too far into the connector outlet
and prevent the plastic seal fitting correctly.
Screw the nut onto the wall bracket and tighten
until the olive is compressed onto the pipework.
(fig.12)
Push button mixer shower
Fig.9
T00357
Fig.10
Fig.11
Fig.12
Connector
9
Finished
wall
Approximately
60mm
Pipe
movement
4 mm
Maximum
Finished
wall
T00355
Finished
wall
Maximum
25 mm
Minimum
21 mm
T00358
Nut
outlet
Olive
Wall bracket
Pipework

Advertisement

Table of Contents
loading

Table of Contents