Installation Tool 1 - Sharp PN-V601 Installation Manuallines

Hide thumbs Also See for PN-V601:
Table of Contents

Advertisement

Installation tool 1

We will provide following service parts for installation (they are subject to fees)
Name (temporary)
Installation handle
(UKOG1005MPZZ)
Installation eyebolt
device
(UKOG1006MPZZ)
Interlocking pipe
(UKOG-1007MPZZ)
* if you need above tools, please contact delivery agent or our sales reps.
CONFIDENTIAL
- For lifting the PN-V601 up to a high location
This device is inserted into holes on top of PN-V601
and enable lifting the PN-V601 up to a high location
during installation.
2 pieces of this device are necessary per one PN-V601.
This installation handle is for improving efficiency of
installation. Please use it if necessary.
- For a crane to lift the PN-V601 up to a high location.
This device is inserted into holes on top of PN-V601
and enable lifting the PN-V601 up by crane.
2 pieces of this device are necessary per one PN-V601.
This installation eyebolt device is for improving the
efficiency of installation. Please use it if necessary.
-For making it easy to install PN-V601
It can reduce gap between the top-to-bottom of the PN-V601 and
interlock each panel from both on the top and bottom of the PN-V601
when installing with a stand etc.
This pipe can prevent PN-V601 from having excessive weight load
from above and underneath.
Please use this interlocking pipe for improving the accuracy when
adjusting the vertical position of displays if necessary. It is not
required for installation.
2 pieces of this pipe are necessary per one PN-V601.
Use
31
PN-V601 Installation Guidelines <Rev1.4 > September.30, 2010
CONFIDENTIAL
Image

Advertisement

Table of Contents
loading

Table of Contents