FlowCon PIM™-DP 65-150 mm (2 1/2"-6")
1H95040 - 04/2020
Measurement
Measure the Δp
Circuit
while turning the adjustment
THE VALVE STABILIZES ITSELF.
Close off procedure
1. Turn the adjustment bolt under the cap
(figure 2) clockwise to fully open position (max.
12.5 Nm).
2. Turn off the ball valve
ing the handle across the pipe and wait for at
least 1 minute.
3. Close the on/off bolt
by turning clockwise with a flat screwdriver on
DN65/80 (2 1/2") or a 13 mm (1/2") Allen key
on DN80/100 (3"/4") and DN125/150 (5"/6").
To open the valve, please follow steps 1 through
3 in reverse order.
Filter cleaning
1. Isolate the filter by turning the valve off (fol-
low the close off procedure).
2. Then remove the copper tubing by loosening
the connection nuts
water leaking is possible due to downstream
pressure.
3. Remove the filter housing
remove the filter
CAREFUL NOT TO DAMAGE ENLARGEN
THE FILTER.
4. Clean the filter and put it back in. It is recom-
mended also to inspect the flow restrictor for
blockage
.
This paper is a supplement to the FlowCon General Instruction
Latest release of any FlowCon material is available on www.flowcon.com
on the p/t plugs
(figure 2)
. WAIT UNTIL
(figure 2) by position-
(figure 2) all the way
. Experiencing some
and thereafter
with a sharp pick. BE
 
Figure 3
 
 
 
Page 2 of 2

Advertisement

loading

Summary of Contents for FlowCon PIM-DP

  • Page 1 4. Clean the filter and put it back in. It is recom- mended also to inspect the flow restrictor for blockage  This paper is a supplement to the FlowCon General Instruction Page 2 of 2 Latest release of any FlowCon material is available on www.flowcon.com...
  • Page 2 THIS PROCEDURE TO BE EFFECTIVE AND   IT MUST BE CARRIED OUT AFTER THE SYSTEM HAS BEEN VENTED. Figure 2 This paper is a supplement to the FlowCon General Instruction Page 1 of 2 Latest release of any FlowCon material is available on www.flowcon.com...