Tools Required - Tiger TIGERFLEX ZORA Assembly Instructions Manual

Hide thumbs Also See for TIGERFLEX ZORA:
Table of Contents

Advertisement

BEFORE YOU GET STARTED

TOOLS REQUIRED

We recommend using the following tools (not supplied):
HAMMER
RUBBER MALLET
SCREWDRIVER +
WOOD SAW
FIXING PACK CONTENTS:
13mm Galvanised Clout Nails
(C13) x80
30mm Galvanised Nails
(N30) x140
30mm Galvanised Nails
(N40) x20
IMPORTANT
• Before assembly please make sure you have a suitable base ready to erect your building on.
• This base MUST be level and flat to ensure that the building is assembled properly and lines up.
• Please carefully unpack the components in your delivery, and remove the untreated timber supports that make up the
boxed pallet.
• DO NOT start your build until you have checked that all the parts of your building are present and in a suitable condition.
• If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of your
order, to give you time to check your delivery.
04
tigersheds.com
DRILL
LADDER
25mm Black Screws
(S25) x16
35mm Screws
(S35) x200
0113 205 4189
sales@tigersheds.com
TAPE MEASURE
SHARP KNIFE
40mm Screws
(S40) x24
50mm Screws
(S50) x18
SPIRIT LEVEL

Advertisement

Table of Contents
loading

Table of Contents