Step 10:
ROOF PANEL INSTALLATION
(MODULE PACK: K & L)
• "Hook" roof panels into notches at apex of gable tops.
• Roof panels should be flush with outer edges of the logs.
• Secure roof to walls and gable tops using the following steps:
4x 35mm
(S35)
screws into gable tops.
1)
(S35)
1x 35mm
screw into gable top spacer.
2)
(S35)
3x 35mm
screws into side walls.
3)
• Secure roof panels to each other using 190mm spacer and
(S35)
2x 35mm
screws.
S35
(Pic J)
(Pic K)
(Pic L)
(Pic M)
Please retain instructions for future reference
Use a spirit level to draw a guide line
for drilling through into walls.
(Pic I)
I
J
S35
S35
K
S35
L
S35
M
S35
17