Low Mass Piping
When installing low mass systems, additional water mass
may be required to avoid short cycling by the boiler. In
these applications it is recommended that a buffer tank be
installed.
Note:
• DHW piping not shown for clarity. Reference applicable sections of this
manual for DHW piping details.
• Internal Boiler circulator used on Primary circuit.
• Reference Buffer Tank Installation Manual for proper sizing and installation.
LOW MASS - PIPING DIAGRAM
Buffer Tank on Central Heat Circuit
H2O Stainless
Steel Buffer
Tank
23
PURGE VALVE
MAGNETIC DIRT
SEPARATOR
PN 240012875 REV. A [01/31/2020]