Leak Check Gas Piping; Gas Orifice - ECR International Dunkirk DCBF-125 Installation, Operation And Maintenance Manual

Condensing gas fired boiler
Hide thumbs Also See for Dunkirk DCBF-125:
Table of Contents

Advertisement

NOTICE
Sediment trap shall be located upstream of gas
controls.
NOTICE
If overheating occurs or gas supply fails to shut off, do
not turn off or disconnect electrical supply to pump.
Shut off gas supply at location external to the boiler.

7.2 Leak Check Gas Piping

Pressure test boiler and gas connection before placing
boiler in operation.
• Pressure test over 1/2 psig (3.5 kPa). Disconnect
boiler and its individual gas shutoff valve from
gas supply system.
• Pressure test at 1/2 psig (3.5 kPa) or less.
Isolate boiler from gas supply system by closing
manual gas shutoff valve.
• Locate leakage using gas detector, noncorrosive
detection fluid, or other leak detection method
acceptable to authority having jurisdiction. Do
not use matches, candles, open flames, or other
methods that can provide ignition source.
• Correct leaks immediately and retest.
7.3 Gas Orifice - See Figure 7-2
Models 125, 150 = 5.8 mm (Natural & LP)
Models 165, 205 = 9.0 mm (Natural & LP)
7 - GAS SUPPLY PIPING
Figure 7-1 - Gas Piping
FIGURE 7-2
Gas Valve
34
Gas Orifice Location
Gas Orifice (Green Side
Down - Toward gas valve)
240012879 REV A, [01/31/2020]