Mr. Heater MH125FAV Operating Instructions And Owner's Manual page 10

Forced air propane construction heater
Table of Contents

Advertisement

Available languages

Available languages

NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
•­Do­not­use­this­heater­for­heating­human­living­quarters.­
•­Use­of­direct-fired­heaters­in­the­construction­environment­can­result­in­exposure­to­levels­of­CO,­CO2,­and­NO2­con-
sidered­to­be­hazardous­to­health­and­potentially­life­threatening.­
•­Do­not­use­in­unventilated­areas.­
•­Know­the­signs­of­CO­and­CO2­poisoning.­
•­Headaches,­stinging­eyes­
•­Dizziness,­disorientation­
•­Difficulty­breathing,­feels­of­being­suffocated­
•­Proper­ventilation­air­exchange­(OSHA­29­CFR­1926.57)­to­support­combustion­and­maintain­acceptable­air­quality­shall­
be­provided­in­accordance­with­OSHA­29­CFR­Part­1926.154,­ANSI­A10.10­Safety­Requirements­for­Temporary­and­Por-
table­Space­Heating­Devices­and­Equipment­used­in­the­Construction­Industry­or­the­Natural­Gas­and­Propane­Installa-
tion­Codes­CSA­B149.1.­
•­Periodically­monitor­levels­of­CO,­CO2­and­NO2­existing­at­the­construction­site­–­at­the­minimum­at­the­start­of­
the­shift­and­after­4­hours.
•­Provide­ventilation­air­exchange,­either­natural­or­mechanical,­as­required­to­maintain­acceptable­indoor­air­quality.
CO
CO
2
NO
2
(Short­Term­Exposure­Limit­=­15­minutes)
CO
CO
2
NO
2
•­Ensure­that­the­flow­of­combustion­and­ventilation­air­exchange­cannot­become­obstructed.­
•­As­the­building­'tightens­up'­during­the­construction­phases­ventilation­may­need­to­be­increased.
Installation­of­this­appliance­at­altitudes­above­2000­ft­(610­m)­shall­be­in­accordance­with­local­codes,­or­in­the­absence­of­
local­codes,­the­National­Fuel­Gas­Code,­ANSI­Z223.1/NFPA­54,­or­National­Standard­of­Canada,­Natural­Gas­and­Propane­
Installation­Code,­CSA­B149.1
The­heater­has­been­shipped­from­the­factory­set­up­for­operation­on­propane­gas.
Mr. Heater, Inc.| Forced Air Propane Construction Heater
WARNING
Air­Quality­Hazard
USA­8-Hr­Time­weighted­average
(OSHA­29­CFR­1926.55­App­A)
50­ppm
5000­ppm
USA­–­Ceiling­Limit
5­ppm
Canada­8-hr­time­weighted­average
WorkSafe­BC­OHS­Guidelines­Part­5.1
and­Ontario­Workplaces­Reg­833
25­ppm
5000­ppm
3­ppm­(Reg­833)
Canada­STEL­(15­minutes­Reg­833/1­hour­
WSBC)­WorkSafe­BC­OHS­Guidelines­Part­
5.1­and­Ontario­Workplaces­Reg­833
100­ppm
15000­ppm­(WSBC)
30000­ppm­(Reg­833)
1.0­ppm­(WorkSafeBC)
5.0­ppm­(Reg­833)
10
Operating Instructions and Owner's Manual

Advertisement

Table of Contents
loading

Table of Contents