Table 39 Tightening Torque (51007) - ABB A130-M65 Operation Manual

Hide thumbs Also See for A130-M65:
Table of Contents

Advertisement

Operation Manual / 4 Product description / A130-M.. - A145-M..
8
Dismantling and fitting
Page 91 / 115
Installing the cartridge group
Figure 45: Installing the cartridge group
Part number
A130
A135
A140
A145
51007
M8
M10
M12
M12
25 Nm
45 Nm
75 Nm
75 Nm
Table 39: Tightening torque (51007)
1. Coat the threads of the studs (51006) with high-temperature grease.
2. Align the casing position of the cartridge group with the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Install the fastening strips (51002) with Verbus Ripp®discs (51003) and hexagon
nuts (51007).
6. Tighten the hexagon nuts (51007).
© Copyright 2015 ABB. All rights reserved.
HZTL4031_EN
Revision C
February 2016

Advertisement

Table of Contents
loading

Table of Contents