F6 Initial Operation; F7 Overview Connector / Counterpart With Description / Scope Of Delivery; F8 Charging Time - Bicker UPSI-1208DPx User Manual

Ups system din-rail
Table of Contents

Advertisement

UPSI-1208DPx

F6 Initial operation

The correct installation of the UPS has to be ensured.
The start is accomplished by connecting the upstream power supply: When an input voltage higher
than 11.5 V is connected to the input terminals, the energy storage gets queried and transmits its data. The UPS
sets the corresponding end-of-charge voltage and releases the pack via the system present signal.After that,
the charging of the energy storage starts.
The applied voltage at the input of the UPS is passed through to the output, reduced by a current-dependent
voltage drop (V
= V
OUT
upstream voltage thresholds at the input (UPS function).
It must be ensured that the source supplies enough current to guarantee the charging process (see chapter F4
„Dimensioning the upstream power supply").
Even after disconnecting the upstream source and also no voltage is measurable at the output,
the UPS can be still powered by the energy storage.

F7 Overview connector / Counterpart with description / Scope of delivery

CONNECTOR
V
/V
IN
OUT
RL
USB
RS232
SCOPE OF DELIVERY
QUANTITY
1x device
1x
1x

F8 Charging time

Charging times depend on energy storage, input voltage and the load current.
Revision 2-0
- 0.6 V at maximum current). The device charges the energy storage and monitors the
IN
PART NO.
Würth Elektronik 691325310004
Würth Elektronik 691305140002
Würth Elektronik 61400416121
D-Sub9 Female
DESCRIPTION
UPSI-1208DP2 or UPSI-1208DP3 - DC UPS
V
/ V
connector counterpart
IN
OUT
Relay connector counterpart
COUNTERPART NO.
Würth Elektronik 691364300004
Würth Elektronik 691304130002
USB type B connector
D-Sub 9 Male
27

Advertisement

Table of Contents
loading

Table of Contents