Assembly Preparation; Assembly Instructions; Mounting The Support Legs To Main Cabinet; Securing The Control Panel To Support Legs - Pit Boss 0094876 Assembly And Operation Instructions Manual

Vertical wood pellet smoker
Table of Contents

Advertisement

Parts are located throughout the shipping carton, including underneath the grill. Inspect the grill, parts, and hardware blister
pack after removing from the protective shipping carton. Discard all packaging materials from inside and outside of the grill
before assembly, then review and inspect all parts by referencing the parts list. If any part is missing or damaged, do not attempt
to assemble. Shipping damage is not covered under warranty. Contact Bunnings Australia or Genesis International Corporation
Pty Ltd. for Customer Service.
IMPORTANT: To ease installation, using two people is helpful (but not necessary) when assembling this unit.
Tools required for assembly: screwdriver and level. Tools not included.
IMPORTANT: It is advised to read each step entirely before starting assembly on instructions. Do not tighten screws
completely until all screws for that step have been installed, or unless otherwise mentioned.

1. MOUNTING THE SUPPORT LEGS TO MAIN CABINET

Parts Required:
1
x
Main Cabinet (#7)
4
x
Support Leg With Wheel (#15)
12 x
¼–20x½" Screw ( #B)
Installation:
Place a piece of cardboard on the floor to prevent scratching the unit
and parts during assembly. First, lift the main cabinet door off the
hinges, and place aside. Note illustration 1A.
Next, flip the main cabinet, bottom side pointed upward, on the
cardboard. Prepare the four support legs for installation, arranging
the labelled legs as shown in illustration 1B.
IMPORTANT: The four support legs must be arranged correctly to be
able to properly install the support panels and support bar in a later
assembly step.
Mount one support leg to the smoke cabinet using three screws. Repeat
installation for the other three support legs. Note illustration 1C.
2. SECURING THE CONTROL BOARD TO SUPPORT LEGS
Parts Required:
#10–24x½" Screw ( #D)
2
x
Installation:
Near the Control Board, loosen the two pre-assembled screws
connecting the front panel to the main cabinet. Note 2A.
Next, using another two screws ( #D) , secure the front panel sides to
the front-facing support legs. Once these screws are tight, re-tighten
the two screws that were previously loosened in 2A. Note 2B.

ASSEMBLY PREPARATION

service@genesiscorp.com.au | +61 8 9248 9822

ASSEMBLY INSTRUCTIONS

1A
1B
15-1
15-2
1C
15-3
15-1
15-2
2
2A
15-3
15-4
15-4
2B
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pbv3p1Pbv2dw13 series

Table of Contents