Sofar solar HYD 5KTL-3PH User Manual page 8

Energy storage integrated inverter
Hide thumbs Also See for HYD 5KTL-3PH:
Table of Contents

Advertisement

installing electrical devices. And assure there is enough fire exit space, convenient
for maintenance. Maintain proper ventilation to ensure enough air cycle to cool the
inverter.
Transport requirements
If you find packing problems that may cause the damage of the inverter, or find any
visible damage, please immediately notice the responsible transportation company.
You can ask solar equipment installation contractor or Shenzhen SOFARSOLAR
Co. , Ltd. for help if necessary.
Transport of the equipment, especially by road, must be carried out with by suitable
ways and means for protecting the components (in particular, the electronic
components) from violent shocks, humidity, vibration, etc.
Labels on the equipment
Electric connection
Please comply with all the current electrical regulations about accident prevention
in dealing with the solar invert.
Danger
HYD 5-20KTL-3PH
The labels must NOT be hidden with objects and
extraneous parts(rags, boxes, equipment, etc.);they
must be cleaned regularly and kept visible at all
times.
Before the electrical connection, make sure to use opaque material
to cover the PV modules or to disconnect PV array DC switch.
Exposure to the sun, PV array will produce a dangerous voltage!
Copyright ©Shenzhen SOFARSOLAR Co., Ltd
- 2 -
User manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HYD 5KTL-3PH and is the answer not in the manual?

Table of Contents