QC Industries AUTOMATION AS40-CD Installation & Maintenance Instructions Manual page 6

Table of Contents

Advertisement

u Stand Height Adjustment
1
Loosen four screws in each
stand bracket using a 5mm
allen wrench.
u Installing Cross Ties
For applications using a single cross tie, the cross tie should be installed between the cross bars of the stands. For applications using two cross ties, the cross ties should
be installed between the uprights of the stands. The installation process is the same for each.
1
Using a 5mm allen wrench,
loosen two socket head cap
screws in each cross tie adjustment
plate.
5
Using a 5mm allen wrench,
tighten Quick Clamp.
6
AS40-CD Conveyors | Installation & Maintenance Instructions
2
Adjust stand height by
turning bolt using a 3/4"
wrench. Turn clockwise to lower or
counter-clockwise to raise. Ensure
conveyor is level.
4
x
2
Slide adjustable cross tie
pieces to fit between stands.
6
Using a 5mm allen wrench,
tighten two socket head cap
screws in each cross tie adjustment
plate.
3
Tighten jam nut against top
plate of stand.
2
x
3
Loosen triangular Quick Clamp
on each end of cross tie.
4
x
4
Tighten four screws in each
stand bracket using a 5mm
allen wrench.
4
Ensuring the socket head cap
screw is facing you, slide Quick
Clamp into tee slot at desired mount-
ing position.

Advertisement

Table of Contents
loading

Table of Contents