Recommended Spare Parts - QC Industries AUTOMATION AS40-CD Installation & Maintenance Instructions Manual

Table of Contents

Advertisement

u Tail Pulley Replacement
1
Press both tension release
buttons and lift up simultane-
ously.
5
Making sure to keep dog
point of set screw facing
down, insert idler pulley back into
slot.
Re-tensioning and tracking of belt may be necessary. (Refer to tracking and tensioning sections of this manual.)
>

Recommended Spare Parts

u Parts List
Part #
1A0039B00WW
AC6-WW-LLL-MAE
1A0102C
1A0103C
1D0317A
1D0057A
1A0033A00WW
1A0036A
C-0117-090
C-0117-100
1A0043A00WW
1D0048A00WW
Use the two digit width of the conveyor for "WW".
>
Use the width and 3-digit length of the conveyor for "LLL".
>
To order parts, please visit QCconveyors.com/serial or call us at +1 (513) 753-6000.
18
AS40-CD Conveyors | Installation & Maintenance Instructions
2
Lift idler pulley out of slot.
6
Press tail pulley down until
it "snaps" into the locked
position.
Description
Tail Pulley Assembly
White Urethane Belt (MVE for V-Guided)
Fixed End Bearing Housing LH
Fixed End Bearing Housing RH
Fixed End Bearing
Center Drive Bearing
Underside Idler Roller 8"- 24" Full Width
Underside Idler 2"- 6" Wide Stub Roller
Drive Timing Belt (≤ 50 Sprocket teeth)
Drive Timing Belt (≥ 52 sprocket teeth)
Center Idler Pulley Assembly
Center Drive Pulley
3
Remove idler pulley from
conveyor.
4
Replace with new idler pulley.

Advertisement

Table of Contents
loading

Table of Contents