QC Industries AUTOMATION AS40-CD Installation & Maintenance Instructions Manual page 15

Table of Contents

Advertisement

u Installation of New Belt (continued)
2
x
13
Tighten screws holding
bracket to stand.
Re-install any full width idlers that where removed prior to belt change.
>
Belt is now ready to be tracked and tensioned. See proper sections of this manual for instructions.
>
Motor Positioning
1
Loosen (do not remove) 6
screws (3 per side) on motor
mount plates.
14
Press down on tension
release tail until it "locks"
into place and creates tension
on belt.
6
x
2
Slide center drive assembly
into position. (Keep in mind
stand placement and underside
idler placement)
6
x
3
Tighten 6 screws (3 per side)
on motor mounting plates.
AS40-CD Conveyors | Installation & Maintenance Instructions
15

Advertisement

Table of Contents
loading

Table of Contents