SolarEdge StorEdge SE7600A-US1 Installation Manual page 50

With backup
Table of Contents

Advertisement

Step 1: Activating the System
 11.  Close the Connection Unit external cover: Attach the cover and secure it by tightening the six screws 
with a torque of 1.2 N*m / 0.9 ft.*lb. 
 12.  Ensure proper conduit sealing; inspect the entire conduit run and use standard conduit sealants to 
avoid water penetration. 
 13.  Turn ON the   C onnection Unit switch.   I f an additional external DC switch is installed between the 
power optimizers/ battery and the inverter(s) then turn it ON.
A status screen similar to the following appears on the LCD panel:
V a c [ V ]
2 4 0 . 7
P _ O K :
- - - - - - - - - - - - - - -
 14.  Verify that the following information appears on the LCD panel:
 
P_OK: Appears only upon pairing process completion and first telemetry reception from the 
l
power optimizers. Indicates connection to the power optimizers and that at least one power 
optimizer is sending monitoring data. 
 
000/000: Appears only upon first telemetry reception from the power optimizers. Indicates the 
l
number of power optimizers that have been paired to this inverter. 
 
S_OK: The connection to the SolarEdge monitoring platform is successful (should appear only if 
l
the inverter is connected to the server).
 
Vac [V]: The grid AC output voltage. Verify the correct value. 
l
 
Vdc [V]: The DC input voltage of the longest string connected to the inverter.   T here should be a 
l
safety voltage of 1V for each power optimizer in the string.
NOTE
A measurement error on the inverter LCD of ±3 V is acceptable.
 
 
Pac [w]: The AC output power (should be 0.0 since the inverter is OFF). 
l
 
OFF: The inverter ON/OFF switch is in the OFF position. 
l
48
V d c [ V ]
P a c [ w ]
1 4 . 1
0 . 0
0 0 0 / 0 0 0
< S _ O K >
O F F
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3

Advertisement

Table of Contents
loading

Table of Contents