Table of Contents

Advertisement

Anytime cycle sequence is modified, softener set-up will revert to
manufacturer setting and must be reprogrammed as desired.
Cycle Sequence instructions allows the operator to set the order of the
cycle. The Softener System Setup allows the operator to set how long
the cycles will last. The operator may choose up to 9 cycles in any order.
END must be used as the last cycle option. The SOFTENING cycle
should only be used in brine prefill applications to allow salt to dissolve.
The following is an example of how to set a valve so that when regeneration is initiated, BACKWASH occurs first, REGENERANT DRAW DN
occurs second, RINSE occurs third, and FILL occurs fourth.
STEP 1CS
[!J
EJEJEJ [!7
1.5
VALVE TYPE
STEP 2CS
SET
[!J
EJEJEJ [!7
ALTERNATOR SYSTEM
STEP 3CS
OFF
SET
[!J
EJEJEJ [!7
ALTERNATOR SYSTEM
ALT A
SET
EJEJEJ [!7
17

CYCLE SEQUENCE

STEP 1CS – Press NEXT and  simultaneously until TYPE appears on screen and release. Then press
NEXT and  simultaneously again for 3 seconds and release. If screen in step 2CS does not appear in 5
seconds the lock on the valve is activated.
STEP 2CS – Valve Type. Use the  or  to select from 1.0", 1.25", 1.50", 2.0" valve.
Press NEXT to go to Step 3CS.
STEP 3CS – Use the  or  to select one of the following:
• OFF; or
• Twin Alternating – Select Alt A or Alt B
• System Board - Allows Demand Recall Programming
• No Hard Water Bypass During Regeneration
• Reclaim Enabled - Allows control to operate in Reclamation Mode
• Separate Source Enabled - Allows control to have a separate water source during the regeneration cycle
• Factory Setting is OFF - Press NEXT to go to next step.
Twin Alternating System – Allows automatic alternation between two units to provide
softened water 24 hours a day.
Use  or  buttons to select ALT A or ALT B
[!J
Select ALT A for the control valve that has the two-pin connector labeled MAV
connected to the alternator valve.
Select ALT B for the control valve that will be connected via three-prong connector
labeled COMM CABLE. Must use 3-wire interconnect cable. Press NEXT to go to Step
5CS.
For Alternating System, change programming:
• Set softener, with volume capacity in GALLONS and select
Regeneration Time Option "IMMEDIATE" or "DELAYED" and select DAYS BE-
TWEEN REGEN as desired.
• For complete programming, see Twin Alternating MAV manual.
Cycle Options
REGENERANT
BACKWASH
DRAW-UP
RINSE
SOFTENING
FILL
END

Advertisement

Table of Contents
loading

Table of Contents