Table Of Contents - Daikin SEHVX20BAW Installation And Operation Manual

Split packaged air-cooled water chiller
Table of Contents

Advertisement

Table of contents

1.1
About this document..................................................................
2.1
Outdoor unit...............................................................................
2.1.1
2.2
Indoor unit .................................................................................
2.2.1
3.1
Identification ..............................................................................
3.1.1
About the outdoor unit.................................................
3.1.2
About the indoor unit...................................................
3.1.3
Operation range ..........................................................
3.2
System layout............................................................................
4.1
Preparing the installation site ....................................................
4.1.1
4.1.2
4.2
Preparing refrigerant piping.......................................................
4.2.1
Refrigerant piping requirements..................................
4.2.2
To select the piping size .............................................
4.2.3
About the piping length ...............................................
4.3
Preparing water piping ..............................................................
4.3.1
pre-pressure................................................................
4.4
Preparing electrical wiring .........................................................
4.4.1
Safety device requirements ........................................
5.1
Opening the units ...................................................................... 10
5.1.1
About opening the units .............................................. 10
5.1.2
To open the outdoor unit............................................. 10
5.1.3
To open the indoor unit ............................................... 10
5.1.4
unit .............................................................................. 10
5.1.5
unit .............................................................................. 11
5.2
Mounting the outdoor unit.......................................................... 11
5.2.1
To provide the installation structure ............................ 11
5.2.2
To provide drainage .................................................... 11
5.3
Mounting the indoor unit............................................................ 11
5.3.1
To provide the installation structure ............................ 11
5.4
Connecting the refrigerant piping .............................................. 12
5.4.1
Using the stop valve and service port ......................... 12
5.4.2
5.4.3
5.5
Checking the refrigerant piping ................................................. 15
5.5.1
Checking refrigerant piping: Setup.............................. 15
5.5.2
To check for leaks: Pressure leak test ........................ 15
5.5.3
To perform vacuum drying .......................................... 15
5.5.4
To insulate the refrigerant piping ................................ 15
5.6
Charging refrigerant .................................................................. 16
5.6.1
About charging refrigerant .......................................... 16
5.6.2
Precautions when charging refrigerant ....................... 16
5.6.3
5.6.4
To charge refrigerant .................................................. 16
5.6.5
Checks after charging refrigerant................................ 17
5.6.6
5.7
Connecting the water piping...................................................... 17
5.7.1
To connect the water piping........................................ 17
5.7.2
To fill the water circuit ................................................. 17
SERHQ020~032BAW1 + SEHVX20~64BAW
Split packaged air-cooled water chiller
4P508019-1C - 2018.04
5.7.3
To insulate the water piping ......................................... 18
5.8
Connecting the electrical wiring.................................................. 18
5.8.1
Field wiring: Overview.................................................. 18
5.8.2
To route and fix the power supply................................ 18
5.8.3
6
5.8.4
6
cables........................................................................... 20
5.8.5
5.8.6
To install the user interface.......................................... 21
6
5.8.7
To install optional equipment ....................................... 21
6
6.1
Making field settings................................................................... 21
6
6.1.1
About making field settings .......................................... 21
6
6.1.2
Field setting components ............................................. 22
6
6.1.3
To access the field setting components....................... 22
6
6.1.4
To access mode 1 or 2 ................................................ 22
7
6.1.5
To use mode 1 ............................................................. 23
7
6.1.6
To use mode 2 ............................................................. 23
7
6.1.7
Mode 1: Monitoring settings......................................... 23
7
6.1.8
Mode 2: Field settings.................................................. 24
7
6.1.9
Field settings on the user interface .............................. 25
7
6.2
Switching between cooling and heating ..................................... 29
7
7
7.1
Precautions when commissioning .............................................. 30
7
7.2
8
7.3
8
7.4
Final check ................................................................................. 32
8
7.5
About the test run ....................................................................... 32
8
7.5.1
8
7.5.2
To test space heating/cooling ...................................... 32
8
7.6
8
9
8.1
Error codes: Overview................................................................ 33
9
10
9.1
Service space: Outdoor unit ....................................................... 34
9.2
Service space: Indoor unit.......................................................... 34
9.3
Piping diagram: Outdoor unit...................................................... 35
9.4
Piping diagram: Indoor unit ........................................................ 36
9.5
Wiring diagram: Outdoor unit ..................................................... 37
9.6
Wiring diagram: Indoor unit ........................................................ 37
10.1
System layout............................................................................. 38
12.1
Operation range ......................................................................... 39
12.2
Quick start-up ............................................................................. 39
12.3
Operating the system ................................................................. 40
12.3.1
About the clock ............................................................ 40
12.3.2
About operating the system ......................................... 41
12.3.3
Space cooling operation .............................................. 41
12.3.4
Space heating operation .............................................. 41
12.3.5
Other operation modes ................................................ 42
12.3.6
Schedule timer ............................................................. 42
12.3.7
Operating the optional demand PCB ........................... 46
12.3.8
12.3.9
13.1
About the refrigerant................................................................... 47
13.2
After-sales service and warranty ................................................ 47
13.2.1
Warranty period ........................................................... 47
13.2.2
Table of contents
21
30
33
34
38
38
38
39
46
Installation and operation manual
5

Advertisement

Table of Contents
loading

Table of Contents