Operator
4145M
Green and yellow
wire (ground wire)
0589D
S-7100A
2. INSTALLATION
<For Americas 220V specifications>
(1) Power switch
(2) Screws [2 pcs]
(3) 3-pin power supply connector
(4) Power cord
(5) Staples [5 pcs]
1. Attach an appropriate plug to the
power cord (4). (The green and
yellow wire is the ground wire.)
2. Insert
the
power
properly-grounded electrical outlet.
NOTE:
・ Take care when tapping in the
staples (5) to make sure that they
do not pierce the cords.
・ Do
not
use extension cords,
otherwise
machine
problems may result.
plug
into
a
operation
10