......................165 x 320 x 279 mm Weight ......................approx. 26 lb........................approx. 12 kg. NOTE: In the interest of higher quality and value, Panduit products are continually being improved and updated. Consequently, pictures may vary from the enclosed product.
The term “power tool” in the warnings refers to your main-operated (corded) power tool. Panduit Corp. recommends the tool be used with all installed safety features. Customer assumes all liability for injury that could result from improper use of this tool and responsibility for all necessary training to ensure safe operation of this tool.
(14) Gauge of Cord WARNING ONLY OPERATE THE CP-881/E A CLEAN, DRY, INDOOR ENVIRONMENT. DO NOT EXPOSE POWER TOOLS TO RAIN OR WET CONDITIONS. Water entering a power tool will increase the risk of electric shock. KEEP AWAY FROM LIVE CIRCUITS: •...
5/16” (8 mm) must be used. • Only the intended PVC insulated cables may be inserted into the funnel guide of the CP-881/E. Never insert solid metal parts or items, the stripping knives would be damaged.
• Only authorized and instructed users are allowed to work with the CP-881/E • The user has a responsibility to other persons inside the CP-881/E work place The customer must: • Make the operation manual accessible to the user; and assure that the user has read and understood the manual.
), with a stripping length of 5/16” (8mm). Due to the short cycle times (1.5 s) and simple changing of cross-sections (below 10 s), the CP-881/E is not only suitable for use in workshops but also in complex cable production systems.
1. Grip For transport of the CP-881/E 2. Funnel Guide The cable to be processed is inserted into the CP-881/E through the funnel guide. Once it has been inserted, work commences automatically. 3. Counter (000000 to 999999) The counter counts the number of end-sleeves used.
NOTE: Be sure that the ferrule band is fed properly. o Connect the main cable with the appropriate connectors (3, 4) to the CP-881/E and the main power supply. The CP-881/E is now ready for operation. OPERATION 1. Prepare the cable Diagram 9: Prepare the cable...
Page 17
3. Start the CP-881/E Diagram 12: Start the CP-881/E o Check that the cover (1) is closed. o Turn on (Position I) the CP-881/E with the main switch (2). o Check that counter (3) is at 0. NOTE: If the counter is not a 0, refer to chapter Faults.
Page 18
5. Stop operation Diagram 14: Stop operation o Read counter (1) if required. o Turn OFF (Position O) the main switch (2) to the CP-881/E. 6. Daily maintenance Diagram 15: Daily maintenance Disconnect the main power supply from the CP-881/E and open cover.
Disconnect the main power supply from the CP-881/E and open cover. o Read counter if required. o Turn OFF the CP-881/E with main switch (1). o Disconnect main cable (2). o Slide back the cover (3). o Pull the pin (4) upwards and pull out the ferrules (5).
The ferrule is not separated from band. Fault Condition 6 Counter respectively, CP-881/E does not work. Fault Condition 7 The CP-881/E works tool slow, but counter works. Fault Condition 8 Crimp stamp or crimp forging die is defective. PA27004A01_03 ENG...
Page 22
Press the reverse button (6) to move the CP-881/E into start position. o Pull out the cable (7). After mounting the tool insert and insertion of the ferrules, the CP-881/E is ready for operation. PA27004A01_03 ENG Page: 20 of 28 10-2013...
Page 23
Press the reverse button (2) to move the CP-881/E into start position. o Turn OFF (Position O) the CP-881/E with Main Switch (3). o Disconnect main cable (4). 2. Remove the tool insert Diagram 24: Remove the tool insert o Slide back the cover (1).
Page 24
Pull out the cable (7). After mounting the tool insert and insertion of the ferrules, the CP-881/E is ready for operation. 4. Remove the cable Diagram 26: Remove the cable o Press the reverse button (2) and pull the...
Page 25
If stripping is faulty, check whether the selected cable cross-section corresponds to the cross- section size of the tool insert and the ferrule feeder block. The tool inserts must be adapted to the cable cross-section if the CP-881/E has not been properly tooled. The cross-section of the cable must also be checked.
Page 26
Counter respectively CP-881/E does not work. 1. Check main connection Check that the main cable is connected correctly to the CP-881/E and the main power supply. Make sure that you have proper power supplied to the plug socket. 2. Check main fuses...