The list below outlines the basic process of setting
up the machine for first-time operation. Specific
steps are covered later in this section.
The typical setup process is as follows:
1.
Unpack machine and inventory contents of
box/crate.
2.
Clean machine and its components.
3.
Move machine to an acceptable location.
4.
Assemble machine and make sure it is ready
for operation.
5.
Connect machine to power source.
6.
Test run machine and various safety compo-
nents to ensure they function properly.
7.
Perform spindle break-in procedure to pre-
pare spindle bearings for operational loads.
-20-

SECTION 3: SETUP

Unpacking

This machine was carefully packaged for safe
transport. When unpacking, separate all enclosed
items from packaging materials and inspect them
for shipping damage. If items are damaged,
please call us immediately at (570) 546-9663.
IMPORTANT: Save all packaging materials until
you are completely satisfied with the machine and
have resolved any issues between Grizzly or the
shipping agent. You MUST have the original pack-
aging to file a freight claim. It is also extremely
helpful if you need to return your machine later.
SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.

Needed for Setup

The following are needed to complete the setup
process, but are not included with your machine.
Description
Additional People
Safety Glasses
Cleaner/Degreaser (Page 22)
Quality Metal Protectant
Disposable Shop Rags
Forklift
Lifting Slings (rated for at least 300 lbs.)
Mounting Hardware (Page 25)
Model G0768/G0769 (Mfd. Since 8/15)