Pre-Operational Testing - Cabletron Systems TRXMIM-24A User Manual

Token ring port switching media interface modules
Table of Contents

Advertisement

Pre-Operational Testing

3.2.6 Pre-Operational Testing
The TRXMIM should now be ready for operation. Before placing
the network into service, proceed to Chapter 4, Testing and
Troubleshooting and test the installation thoroughly to be sure
that all stations are able to be addressed and that data is being
relayed without error. Verify also that the networking software is
configured properly to match the installed network.
Page 3-9

Advertisement

Table of Contents
loading

Table of Contents