Before Installing - Burnham K2WT Residential Installation, Operating And Service Instructions

Table of Contents

Advertisement

II. Specifications
(continued)
Table 2.2: Specifications
Maximum
Minimum
Model*
Input
Input
(MBH)
(MBH)
K2WT-080B
80
K2WT-100B
100
K2WT-120B
120
K2WT-150B
150
K2WT-180B
180
K2WT-180M
180
* The Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15. The manufacturer should
be consulted before selecting a boiler for installations having unusual piping and pickup requirements, such as
intermittent system operation, extensive piping systems, etc.
Table 2.3: Vent Lengths
Model
Vent/Intake Size
K2WT-080B
K2WT-080B
K2WT-100B
K2WT-100B
K2WT-120B
K2WT-150B
K2WT-180B
K2WT-180M
See Section VII (Venting) for additional requirements and details.
III. Before Installing
1. Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict
accordance with this manual and the requirements of the authority having jurisdiction.
• In the absence of an authority having jurisdiction, installation must be in accordance with this manual
and the National Fuel Gas Code, ANSI Z223.1. In Canada, installation must be in accordance with the
B149.1 Installation Code.
• Where required by the authority having jurisdiction, this installation must conform to the Standard for
Controls and Safety Devices for Automatically Fired Boilers (ANSI/ASME CSD-1).
2. Read Section VII to verify that the maximum combustion air and exhaust pipe lengths will not be exceeded
in the planned installation. Also verify that the vent terminal can be located in accordance with Section VII.
3. Make sure that the boiler is correctly sized:
• For heating systems employing convection radiation (baseboard or radiators), use an industry
accepted sizing method such as the I=B=R Guide RHH published by the Air-Conditioning, Heating and
Refrigeration Institute (AHRI).
• For new radiant heating systems, refer to the radiant tubing manufacturer's boiler sizing guidelines.
• For system which includes an indirect water heater, make sure the boiler has the output called for by the
indirect water heater manufacturer's instructions.
107672-03 - 5/18
D.O.E.
AHRI Net
Heating
Rating *
Capacity
(MBH)
(MBH)
8
74
64
10
94
82
12
112
97
15
142
123
18
169
147
18
168
146
Nominal
Min Vent Length
(in)
2
3
2
3
3
3
3
3
Supply
Water
Dim.
& Return
Volume
"A"
Connection
(gal.)
Size (NPT)
0.430
17"
1"
0.547
17"
1"
0.650
17"
1"
0.956
21"
1"
0.956
21"
1"
0.790
21"
1"
Max Vent Length
(in)
12
60 ft
12
135 ft
12
60 ft
12
135 ft
12
135 ft
52
135 ft
52
135 ft
52
135 ft
Approx.
Altitude Range (ft)
Gas
Net
Connection
Weight
Size (NPT)
NG
(lb.)
1/2"
100
0-10100
1/2"
102
0-10100
1/2"
105
0-10100
1/2"
119
0-10100
1/2"
119
0-2000
1/2"
119
2001-10100
Approx.
Derate at Max Vent
(%)
9
2
15
3
7
7
9
9
LP
0-2000
0-7800
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

K2wt-180b-6t02K2wt-120b-6t00

Table of Contents